| Investor | Công ty CP Dệt may Phước Đông |
|---|---|
| Location | Phuoc Dong IP, Go Dau |
| Scale | 25,000 m² plant running 3 continuous shifts |
| Scope of work | Full M&E package |
| Region | Go Dau |
| Timeline | 02/2022 – 10/2023 |
A 25,000 m² textile plant in Phuoc Dong IP running 3 continuous shifts — demanding absolutely stable power and factory ventilation meeting workplace temperature standards.
KT M&E delivered the full package: substation, power distribution, factory ventilation & cooling, process water systems. Handed over on the 18-month contractual milestone.